The Basement Project
Begun in April of 2011. Finished...????
This is the southeast corner of the back room of my basement. Keep in mind that this is after six weeks of working on the cleaning and organizing project.
This is taken from the same spot as the previous picture, looking to the left.
This moving 2/3 of the way to the east and looking back at the same set of shelves.
This is taken from the same spot as the previous picture, looking to the left.
This is taken from near the door between the two basement rooms, looking south.
This is taken from about the same spot, looking southwest.
This is from in front of the Viking display, looking west. Six weeks into the project with who knows how much longer to go. And you haven't seen the garage yet....or the upstairs computer room...or the attic. I wish I had documented how bad it was at the start. (Well, then again...)
This is the Southwest corner of the big room.
Temporary Zulu Storage. I figure I'll be working with this stuff again soon.
I used one of the empty areas in the back room for this display. I figured since I'm the only one who has single color metal BOSS figures, I ought to display them. Then I sort of got carried away.